Job Detail
Structural Design of Tailpool Structure for Hydropower Project
End Date: May 20 2026NRs 7000 - 14000
2 bids
We are looking for a qualified structural designer to carry out the complete structural design of a Tailpool (structure after power house) for a Hydropower Project. The structure measures approximately 40m in length, 20m in width, and 14m in height.
The designer must have proven experience in designing at least one similar hydraulic/hydropower structure using Nepal Building Code (NBC) or Indian Standard (IS) codes. A concrete outline drawing will be provided to the selected designer.
Required Deliverables: Hand sketches or AutoCAD drawings of all structural components, SAP2000 model file, and detailed calculation annex. The entire design work shall be completed within 8 days after assignment of the work.
Expertise required: Civil Engineering or Structural Engineering. Some guidance will be provided if necessary.
Payment modality will be discussed and mutually agreed before starting the work. Designers who wish to bid privately may change their display name and photo without violating any international rules; however, all information provided in the CV and professional license must remain fully authentic.
About Client
- Chapagaun 2, Lalitpur, Bagmati, Nepal
- ★★★★☆
- Member since Dec 19, 2024
Similar Jobs
Review of Tunnel and Penstock Pipe Connection for Water Tightness
NRs 5000 - 14999
HVAC System Design and Complete Documentation
NRs 40000 - 75000
Medical Gas Pipeline System (Including Manifold) Design & Documentation
NRs 40000 - 60000
2 freelancer(s) are bidding
Mahesh Maharjan
I have experience in the structural analysis and design of tailpool structures for hydropower projects, and I would like to contribute my expertise to this project. I am highly interested in being involved in the project and believe that my technical background and practical experience in hydropower structural design would enable me to make a valuable contribution to the successful execution of the work.
more13500 in 8 days
★★★★★
Asmit Paudel
I have 4 years of experience in hydropower sector and also designed a tailpool structure. The design shall be submitted within the stated timeframe.
more