Job Detail
Review of Tunnel and Penstock Pipe Connection for Water Tightness
End Date: May 13 2026NRs 5000 - 14999
1 bidsAbout Client
- Chapagaun 2, Lalitpur, Bagmati, Nepal
- ★★★★☆
- Member since Dec 19, 2024
Similar Jobs
Structural Design of Tailpool Structure for Hydropower Project
NRs 7000 - 14000
HVAC System Design and Complete Documentation
NRs 40000 - 75000
Medical Gas Pipeline System (Including Manifold) Design & Documentation
NRs 40000 - 60000
1 freelancer(s) are bidding
Niraj Shrestha
I have reviewed the project description regarding the tunnel–penstock interface connection review for the hydropower/water conveyance system. I have previous experience in steel liner/penstock connection arrangements with concrete structures, including evaluation of embedded steel sections, water tightness provisions, interface detailing, and constructability considerations for underground hydraulic structures. For this assignment, I can review the proposed drawings and assess: • Structural compatibility between tunnel lining and steel penstock • Water tightness and leakage prevention measures • Transition detailing near the interface • Water stops, grout / concrete arrangements • Potential risks due to differential movement, shrinkage, temperature effects, or vibration I am comfortable participating in online technical discussions with the design team and can complete the review within the required 4-day duration after receiving the drawings and design information. Please share the available drawings, design assumptions, loading conditions, and any previous calculations for detailed review.
more